Building Construction MCQs

287 questionsCivil-EngineeringPage 27 of 32

Practice free Building Construction multiple-choice questions with instant answer feedback and step-by-step solutions. Click an option to check yourself, reveal the full explanation, and work through all 287 questions — no login required.

Question 235medium
The construction joints in buildings are provided after
Question 236medium
In case of multi-storeyed buildings, the forms to be removed first are
Question 237hard
A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to
Advertisement
Question 238hard
The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as
Question 239medium
The arrangement made to support an unsafe structure temporarily, is known as
Question 240medium
The steel pile which is generally sunk in soft clay or loose sand of low bearing capacity, is
Advertisement
Question 241easy
Rotary drilling
Question 242hard
For providing a raft foundation, the following activities are involved i) Ramming the foundation bed ii) Excavation of the soil upto required depth iii) Laying the reinforcement over the foundation bed iv) Curing the cement concrete placed over reinforcement v) Pouring the cement concrete over the reinforcement The correct sequence is
Question 243medium
Queen closer may be placed