Building Construction MCQs

287 questionsCivil-EngineeringPage 11 of 32

Practice free Building Construction multiple-choice questions with instant answer feedback and step-by-step solutions. Click an option to check yourself, reveal the full explanation, and work through all 287 questions — no login required.

Question 91medium
The lower half portion between crown and skew back of the arch, is called
Question 92medium
A floor constructed with 3 mm marble chips, is known
Question 93medium
A floor constructed with the 4 to 6 mm marble chips, is known
Advertisement
Question 94easy
As compared to English bond, double Flemish bond is
Question 95medium
In case of Raymond pile
Question 96medium
A stair should not have pitch more than
Advertisement
Question 97medium
The type of bond in a brick masonry containing alternate courses of stretchers and headers, is called
Question 98hard
If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is
Question 99medium
The arrangement of supporting an existing structure by providing supports underneath, is known as